Mersin M2 Tram Line

Location
Mersin


Country
Türkiye


Client
Mersin Metropolitan Municipality


Contractor


Features / Capacity / Area

9.93 Km / 11 Stations


Contract Date
2021 December

Within the scope of the Mersin M2 Tram Line, which will operate integrated with the existing M1 metro line. The line has 11 stations.

Concept, preliminary and final projects and tender documents of the tram line have been prepared.

The work carried out within the scope of work is as follows;

  • Preparation of design handbooks
  • Transportation and track study report
  • Alignment, rail and track design
  • Earthquake survey report
  • Financial and economic feasibility study, sensitivity analysis, cost-benefit analysis (cba)
  • Historical sites report
  • Building stock risk analysis
  • Geological site studies and reports
  • Architectural (interior and exterior, finishing works, details, passenger analysis),
  • Structural and geotechnical design,
  • Electrical and mechanical installation, mv, radio, CCTV, announcement simulations, CFD, SES, piston effect simulations, medium voltage traction and catenary system, traffic, firefighting and evacuation design
  • Drainage and infrastructure design
  • Landscape and urban renewal work
  • Preparation of tender documents, BoQ, technical specifications and unit price descriptions.