Istanbul Sariyer – Ayazaga – ITU Metro Line
Category Rail and Metros
Istanbul Sariyer – Ayazaga - ITU Metro Line
Location
Istanbul
Country
Turkey
Client
Istanbul Metropolitan Municipality
Contractor
–
Features / Capacity / Area
8.3 km / 9 Stations
Contract Date
2015 January
Tendered by Istanbul Metropolitan Municipality, Sariyer – Ayazaga metro line is 8.3 km long and includes 9 stations.
Prota’s services included; track-way alignment engineering, preparation of route alternatives, selection of the most appropriate route based on surveying studies, determining the location of stations, preliminary design of stations, preparation of operational scenarios and development plan along with financial and economic feasibility studies.
In 2023, it is estimated that the line will carry 107.700 passengers daily.