Yahsiyan 895 MW CCPP

Location
Kirikkale, Yahsiyan


Country
Türkiye


Client
ACWA Power


Contractor
Samsung C&T Corporation


Features / Capacity / Area
895 MW


Contract Date
2014 September

The Kirikkale Combined Cycle Power Plant (CCPP) Project is situated within the municipality of Kiliclar in the Yahsiyan District of Kirikkale province, 15 kilometers from Kirikkale City Centre and 50 kilometers east of Ankara. ACWA Power is the developer and investor of the CCPP, and the project was constructed under a turnkey Engineering, Procurement, and Construction (EPC) Contract with Samsung C&T Corporation.

 

The plant is operated and maintained by Nomac Enerji. The project operates on a merchant basis, selling dependable power capacity and electricity dispatched via bilateral contracts and in the balancing/day-ahead market. This project represents a significant investment in the region’s energy infrastructure, contributing to the reliable supply of electricity to the area.

 

Prota provided services in all branches within the scope of the facility project, in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;

  • Geotechnical and geological design
  • Earthwork services
  • Reinforced Concrete and Steel Design
  • Architectural Design
  • Electrical and ICT Engineering Design
  • Mechanical Engineering Design
  • Landscape and infrastructure Services
  • Technical Consultancy Services
  • BoQ and technical specification preparation services

More Projects