Plurawatt Energy Systems Building
Category Energy
Plurawatt Energy Systems Building
![](https://www.prota.com.tr/wp-content/uploads/2010/10/sunlego-e1721022269930.jpg)
Location
Ankara
Country
Türkiye
Client
Sunlego Energy Systems Inc.
Contractor
—
Features / Capacity / Area
—
Contract Date
2010 September
Plurawatt Energy Systems building was transformed from the disused prefabricated building into a to a facility that manufactures solar panels. Prota provided structural design and construction supervision.
Entire design works were completed in 2010.
Prota provided services in the concept, preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Seismic engineering design
- Reinforced concrete and steel design
- Technical consultancy services
- BoQ and technical specification preparation services
More Projects
![](https://www.prota.com.tr/wp-content/plugins/elementor/assets/images/placeholder.png)