Moscow Waste-to-Energy Power Plant
Location
Moscow
Country
Russia
Client
Moscow Metropolitan Municipality.
Contractor
Yenigun Constr. Inc
Features / Capacity / Area
600,000 tones/year
Contract Date
2019 November
Yenigun Construction Inc undertaken a 700,000 yearly waste capacity Waste-to-Energy Facility in Moscow.
The Moscow Waste Incineration Plant has been launched in late 2019, and all stages have been completed by 2021.
Prota provided services in all branches within the scope of the facility project preliminary, final and detail stages. Within the scope of the project, Prota’s services include;
- Architectural design
- Reinforced concrete and steel design
- Fire evacuation and fighting engineering design
- Electrical and ICT engineering design
- Mechanical engineering design
- Landscape and infrastructure design
- BoQ and technical specification preparation services