Two metro lines and one tram line, for which Prota provided comprehensive design services, were successfully commissioned.
Category News
Two metro lines and one tram line, for which Prota provided comprehensive design services, were successfully commissioned.
As Prota Engineering, we are proud to share with you another success that reinforces our leading position in the sector. In the last two months, two metro lines and one tram line, for which Prota provided comprehensive design services, were successfully commissioned.
- Istanbul, Bakırköy-Kirazlı Halkalı Metro Line: Opened on March 10, 2024, this line is 8.4 km long with 7 stations.
- Izmir, Fahrettin Altay-Narlıdere Metro Line: Opened on February 24, 2024, this line is 7.2 km long and consists of 7 stations.
- Izmir, Cigli Tram Line: Opened on January 27, 2024, this line has a route of 11 km and 14 stops.
These projects reflect Prota’s deep expertise and multidisciplinary approach in transportation engineering. Our company, which provides services in many disciplines such as alignment design, track design, architectural, geotechnical, tunneling, structural, electrical, telecommunication and mechanical services, is among the leading companies in the sector.
As Prota Engineering, we will continue our efforts to shape the transportation solutions of the future and improve the quality of life. We would like to thank all our teammates who contributed to the realization of these important projects.